Fully stripped - bottom bracket area. Hydroformed shaping can be seen just below the B on the downtube |
Front end installed |
Shimano triple installed - good view here of hydroforming on the down tube |
Rear end installed |
End result - large frame with all the components swapped over from the smaller frame |
Stripping down the Desert Bronze large frame took about 90 mins, removing the components from the black and silver medium frame also took about 90 mins. Cleaning took another 30 mins (the components from the medium frame were already very clean). Assembly about 60 mins then another 30 mins to make sure all the adjustments were OK. Only 2 x new gear cables were needed. All runs well and looks great.
Time to get started on putting all the components from the larger frame and onto the smaller frame.
No comments:
Post a Comment
Please keep your comments polite, relevant, interesting, and above all, family friendly! Thanks for your input.